Nucor Steel Memphis bar mill automation upgrade
By upgrading existing hardware with technologically advanced systems, retrofitting increases automation equipment functionality and reliability.
Projects
CSN two-strand slab caster automation and drives upgrade
In January 2023, the CSN and Russula team commissioned the second phase of the drives and automation upgrade for the continuous slab caster.
Projects
Russula supplies 550,000 tpy wire rod mill
The start-up of the new rolling mill at the Celsa France complex in Bayonne allowed CELSA Group™ to further diversify its activity and boost its international business to invoice new growth as of next year.
Projects
Mill Pulse® Manufacturing Execution System implementation at Celsa Nervacero
Celsa Nervacero is currently running the Mill Pulse® Delay Tracking and Production Management and Scheduling modules.
Projects
Russula improves Liberty Steel’s wire rod mill
Liberty Steel & Wire has contracted Russula to upgrade the two-strand wire plant located in Peoria, IL, USA.
Projects
Liberty Steel & Wire improves production with Mill Pulse®
Liberty Steel and Wire implements Russula’s Manufacturing Execution System Mill Pulse®
Projects
Big River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.
Projects
Gerdau Charqueadas Phase 3 electrical upgrade
After the successful commissioning of Phases 1 and 2 of the automation and electrical upgrade at the SBQ combined bar and wire mill in Charqueadas, Brazil, the Gerdau and Russula team successfully put into operation Phase 3 on September 6, 2023.
Flagship projects
- 2023Kingman, AZ, USA
Nucor Kingman bar finishing mill upgrade
Obsolete automation and drives equipment will be replaced with new, modern, first line electrical equipment.
- 2023Darlington, SC, USA
Nucor Steel Memphis bar mill automation upgrade
By upgrading existing hardware with technologically advanced systems, retrofitting increases automation equipment functionality and reliability.
- 2023Volta Redonda, Rio de Janeiro, Brazil
CSN two-strand slab caster automation and drives upgrade
In January 2023, the CSN and Russula team commissioned the second phase of the drives and automation upgrade for the continuous slab caster.
- 2023Charqueadas, Rio Grande do Sul, Brazil
Gerdau Charqueadas Phase 3 electrical upgrade
After the successful commissioning of Phases 1 and 2 of the automation and electrical upgrade at the SBQ combined bar and wire mill in Charqueadas, Brazil, the Gerdau and Russula team successfully put into operation Phase 3 on September 6, 2023.
- 2023Charqueadas, Rio Grande do Sul, Brazil
Advanced automation at Gerdau Pindamonhangaba improves special steel billets and heavy bar cooling
The partnership between Gerdau and Russula continues in the automation of the Rolling Mill #1 cooling bed that will improve the temperature cooling for the special steel billets and heavy bars.
- 2019Bayonne, France
Russula supplies 550,000 tpy wire rod mill
The start-up of the new rolling mill at the Celsa France complex in Bayonne allowed CELSA Group™ to further diversify its activity and boost its international business to invoice new growth as of next year.
- 2023Bilbao, Spain
Mill Pulse® Manufacturing Execution System implementation at Celsa Nervacero
Celsa Nervacero is currently running the Mill Pulse® Delay Tracking and Production Management and Scheduling modules.
- 2022Osceola, AR, USA
Big River Steel Works
BRSW has awarded Russula the construction of one of the largest water treatment plants ever built for the metallurgical sector. The water plant is divided into 13 circuits that treat daily more than 65M l/h.
- 2023Peoria, IL, USA
Liberty Steel & Wire improves production with Mill Pulse®
Liberty Steel and Wire implements Russula’s Manufacturing Execution System Mill Pulse®
ARCHIVES
All our
projects
Third stacker drives and control for bar and section mill
2002 - Celsa 3 - Barcelona, SpainControl system for 170 ton/hr new walking beam reheat furnace
2002 - Celsa GSW - Santander, SpainControl system upgrade
2002 - Gerdau Divinopolis - Divinópolis, MG, BrazilAutomation supply for 3 new stands
2002 - Gerdau Riograndense - Sapucaia do Sul, RS, BrazilControl system for new walking beam reheat furnace
2002 - Megasider Zaragoza - Zaragoza, SpainElectrical and control upgrade for Stelmor and coil handling system
2001 - Celsa 2 - Barcelona, SpainDrives and control mill upgrade
2001 - Celsa GSW - Santander, SpainControl system for new 90 ton/hr walking hearth reheat furnace
2001 - Celsa Atlantic Laracha - Laracha, Spain
To offer the best experiences, we use technologies such as cookies to store and/or access device information. Consent to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Failure to consent, or withdrawal of consent, may adversely affect certain features and functions.